Department Of
Community Planning
Zoning
Permit
- An approved zoning permit
is required before any excavation,
construction, relocation or
installation is started for a new
land use. Except for conditional
uses, projects in the GU-1 zoning
district do not require a zoning
permit.
Zoning Permit Application
PDF -
MSWord
Floodplain
Permit
- An approved
floodplain permit is required for
any new or substantially improved
structure, alteration of a
watercourse, or other development
within the flood hazard area (Flood
Zone A).
Floodplain Permit Application -
PDF
Grandfather Rights Application -
PDF
Questions? Contact the Planning
Department at
planning@co.fairbanks.ak.us
or (907) 459-1260.
 |
DEPARTMENT OF
PUBLIC WORKS
Rural
Services Division 459-1333
CONSTRUCTION PERMITS
Fairbanks North Star Borough Code of
Ordinance, Title 14, Chapter 14.03
Excavation and Construction on
Public Roads Within Road Service
Areas provides for protection
of public roads from construction or
excavation activities. This
ordinance requires a permit prior to
any work taking place, including
driveway installations, within the
right of way. The processed permit
provides instructions and
reconstruction standards to assist
in building it the right the first
time.
|
|
Construction Permit
Application for Driveways
-
PDF
|
|
|
Construction in Right of Way
Permit Application
-
PDF
|
Design
& Construction Division 459-1345
Permanent
Storm Water Control Plan
-
A Permanent Storm Water Control Plan
must be submitted and accepted by
the Department prior to the issuance
of a site development permit (see
below). The plan must be developed
by a CPESC or a professional
engineer registered and licensed in
Alaska. For more information on
plan contents, see the
FNSB BMP
Design Guide.
Site Development Permit-
An approved site
development permit is required prior
to the commencement of any
construction activities that disturb
greater than 1 acre (including
projects less than 1 acre that are
part of a larger common plan of
development or sale that will
collectively disturb more than one
acre) and will discharge storm water
to a FNSB road service area storm
water conveyance system within the
Fairbanks Urbanized Area.
Site Development Permit Application
and Checklist -
PDF
Fairbanks
Stormwater Management Program
Solid
Waste Division 459-1482
Demolition of Large Projects-
Debris intended for disposal
at the FNSB Landfill from demolition
of large projects is subject to
additional considerations prior to
delivery. Complete a Demolition and
Large Project Application and return
to the landfill.
Demolition
of Large Project Application
|